Note the following when installing and commissioning a customized cabinet:
** Site preparation ** : Ensure that the installation site meets the requirements, the ground is smooth, and the space is sufficient.
** Cabinet fixation ** : Firmly fix the cabinet in the specified position to prevent shaking or displacement.
** Horizontal and verticality ** : Ensure the levelness and verticality of the cabinet to avoid affecting the installation and running of devices.
** Cable Import ** : Plan the cable import path to avoid damage or clutter.
** Ground connection ** : Ensure reliable ground connection to ensure equipment safety and electromagnetic compatibility.
** Equipment installation sequence ** : Install internal devices in a reasonable order to avoid unnecessary trouble.
** Space layout ** : Rationally arrange the device in the cabinet to ensure heat dissipation and easy operation.
** Identification Check ** : Check whether the device identification is consistent with the design requirements to prevent installation errors.
** Power connection ** : Correctly connect the power supply and check whether the voltage and other parameters meet the requirements.
** Communication test ** : Test the communication function of the equipment involved in communication to ensure that the signal is normal.
** Heat dissipation check ** : Ensure that the heat dissipation system works properly to avoid overheating.
** Appearance Check ** : Check whether the cabinet is damaged or defective.
** Operation test ** : Test the operating parts to ensure normal function.
** Coordinate with other systems ** : Coordinate with other surrounding systems to ensure smooth overall operation.
** Debugging records ** : Make detailed debugging records to facilitate subsequent maintenance and problem tracing.